VM-300(装载量 300 kg) — Vacuum Sintering Furnace VM-300

A single-chamber horizontal electric vacuum sintering furnace: 1500°C working / 1550°C max temperature, ultimate vacuum ≤0.7 Pa, 300 kg graphite-cage load, built-in vacuum dewaxing with condensation collection — suitable for almost all MIM products.

Equipment Overview

The VM-300 is a single-chamber, horizontal, electrically heated vacuum sintering furnace with an inert atmosphere system. An inner chamber ensures the binder decomposed during debinding is fully discharged without contaminating the furnace wall or insulation; the compact design reduces gas and heating power consumption, lowering operating cost.

The furnace shell is water-cooled double-wall SUS304 stainless steel. Heating uses high-density graphite rod elements arranged 360° around the zone with 40 mm rigid graphite felt insulation. Graphite plates/heaters are from TOYO TANSO (JP) and felt from SGL (DE).

The vacuum system combines an HGL-150 rotary piston pump (150 L/s) and a ZJP-600 Roots pump (600 L/s); ultimate pressure ≤0.7 Pa (clean, empty furnace), leak-up rate <1.33×10⁻³ Pa·m³/s.

A binder-gas condensation collection device keeps residual binder below 0.5%. Partial pressure is controllable from 1–85 kPa, ideal for MIM sintering. Control: Honeywell programmer with a 15-inch MCGS touch screen and 99 storable process curves.

Key Features

Applications

Technical Specifications

Furnace shell typeHorizontal; door: manual / pneumatic
Shell materialSUS304 stainless steel
Installation size3500×3080×3570 mm (W×H×L)
WeightApprox. 5500 kg
Operating / max temperature1500 ℃ / 1550 ℃
Heating rate0.1–10 ℃/min adjustable
Temperature uniformity≤±5 ℃ at 1380 ℃
Heating powerTwo sets of 60 kVA transformers
Heating zoneØ600×1800 mm (Ø×L)
Graphite cage485×400×1670 mm (W×H×L)
Graphite board430×750×5 mm, 32 pcs
Workpiece space420×370×1500 mm
Max. load300 kg (incl. cage)
Heating elementsHigh-density graphite rods, 360° surround (TOYO TANSO)
Insulation40 mm graphite hard felt
Ultimate pressure≤0.7 Pa (clean & empty)
Leak-up rate<1.33×10⁻³ Pa·m³/s
Vacuum pumpsHGL-150 rotary piston 150 L/s (11 kW) + ZJP-600 Roots 600 L/s (7.5 kW)
Debinding systemBinder condensation collection, residue <0.5%; partial pressure 1–85 kPa
ValvesSolenoid (CKD), globe/butterfly/proportional (Kitz)
Process gasN2 99.999%, Ar 99.999% (H2 optional)
Cooling water320 L/min; inlet 2–5 kg/cm²; ≤32 ℃
Cooling fan10 HP motor (7.5 kW), 1350→100 ℃ in approx. 4 h
Control systemHoneywell programmer + MCGS 15-inch touch screen, PID, two-zone (up/down) control, Type W thermocouple ×2
Vacuum gauge / gas flowLeybold gauge / Azbil mass flow
Total connected power140 kVA (380V 50/60Hz, 3-phase)
Process typesVacuum sintering (in/out), vacuum debinding, partial-pressure sintering, vacuum cooling, fast cooling, partial cooling
SafetyOverload & water-temperature protection, independently heated pipelines, explosion protection, no power-on with insufficient vacuum, water-flow alarm
WarrantyOne year

Site Navigation